Fri. 6/12/15

BB Bench 5×5 – Then 1×20 @ 50% to 60% of heavy 5 Post loads – BB Row 4×10 – 9-15-21-15-9 KB Swing (32/24) Box Jump (24/20)

Th. 6/11/15

10! Power Snactch (115/88) 15 DU (Sub: 100m) 10 Singles 5 C2B Pull Ups

Wed. 6/10/15

DL 5/5 – DL 1xME TO 20 @ 50% of Heaviest 5 – 5 Rounds 500m Row 400m Run

Tues. 6/9/15

5MIN. Rope Work – PP 5X5 Post Load – 10! DB Thrusters 5 DB Pushups 1! DB Box Step Overs